Contract amount: $ 2.9 million Hedrick Force Main Crossing: Our work for the City of Houston included the demolition and replacement of the existing aerial force main with underground 42-inch force main, crossing Buffalo Bayou at Wayside Drive and 69th Street. For more details on this project, please contact Reytec Projects.
KIRBY DRIVE STORM SEWER RELIEF PROJECT SEGMENT 3
Contract amount: $14.3 million Kirby Drive Storm Sewer Relief Project Segment 3: Reytec served as the prime contractor to the City of Houston and was responsible for the traffic control, street lighting, pavement markings, pollution prevention, site work/landscaping, demolition of existing concrete/asphalt and paving (curbs, sidewalks and storm sewer). This project consisted of: approximately 2,945 linear feet of 14-foot by 12-foot reinforced concrete box storm sewer, 1,544 linear feet of 24-inch, 30-inch, 36-inch and 48-inch storm […]
Neighborhood Street Reconstruction (NSR) No. 465
Contract amount: $15.3 million Neighborhood Street Reconstruction No. 465A: This job included the construction of paving, drainage, water and wastewater improvements along segments of various neighborhood streets throughout the Springwood Oaks, Timber Oaks, Wrenwood Oaks and Royal Oaks subdivisions in the Spring Branch area. For more details on this project, please contact Reytec Projects.