Current Opportunities
Reytec Construction Resources is always looking for reliable contractors and suppliers for bid opportunities. We’re currently looking for sub-contractors and suppliers in the following areas.
- Concrete Sidewalks and Driveways
- Clearing and Grubbing (Trees and Shrubs)
- Channel Regrading
- Traffic Signal
- Electrical and Fiber optics
- Microtunneling and Boring
- Small Dia Water Line and Sanitary Sewer
- Tree Planting and Landscaping
- Trucking
- TV Inspection
- Concrete Sloped Pavement
- Concrete Curbs
- Asphalt Paving
- Concrete Structures
- Pavers
- Water Line Welding
Bid Opportunities
Please review the upcoming bids noted below and submit your bid at least 2 days before the bid date to Jessica Iniguez or contact her at 713-600-3026. We encourage you to visit this page each month for new bid opportunities.
Job Name | Owner | Bid Date | Job Description | Documentation Link |
---|---|---|---|---|
HPW – Garden Oaks and Shepherd Park (West) Drainage & Paving Improvements Subproject 1 | City of Houston | 2/25/2021 at 10:30 AM CST
Microsoft Teams Number 1-936-755-1521 ID:419106683# |
Installation of new storm sewer and related appurtenances, replacing street pavement, driveways, curbs, sidewalks, water lines and services and related appurtenances, installation of sanitary sewer and related appurtenance throughout the project limits | Drawings & Specs |
HPW – FY2021 Drainage Rehab (SWAT) Work Orders #4 | City of Houston | 2/25/2021 at 10:30 AM CST
Microsoft Teams Number 1-936-755-1521 ID:419106683# |
Rehab of City of Houston storm sewers, outfalls, roadside and off-road ditches | Drawings & Specs |
Wastewater Treatment Facility Expansion to 990,000 GPD within Harris-Fort Bend Counties Municipal Utility District No. 3 | Harris-Fort Bend Counties Municipal Utility District No. 3 – Vogler and Spencer Engineering, Inc. | 2/25/2021 at 2 PM CSTonline bidding only |
Wastewater treatment facility expansion to 990,000 GPD and on-site detention basin | Drawings & Specs |
HPW – Shepherd/Durham Paving and Drainage | City of Houston | 3/04/2021 at 10:30 AM CST Microsoft Teams Number 1-936-755-1521 ID:419106683# |
Project consists of the construction of approximately 4,000 linear feet of 4-lane undivided – concrete roadway each on Shepherd and Durham, with curbs, gutters, an underground storm sewer system, new inlets, sidewalks, streetlights, traffic signals, on street bike path and underground utilities for Shepherd and Durham. | Drawings & Specs |
JHEC CMAR NPW BP 20.01 LS Rehab BP 20.02 Headworks BP 20.03 Structures BP 20.04 Process Install BP 20.05 Site Paving, Fence and Yard Piping BP 02.02 Landscape BP 02.03 |
John Hargrove Environmental Complex Water Reclamation Facility Expansion Project |
3/09/2021 at 2 PM CST Send bid package through email. |
n/a | |
NHCRWA-Project 28D-Proposed 60″ Waterline Along Mills Rd/ Greens Bayou from FM 1960 to NHCRWA Project 16 | AECOM – North Harris County Regional Water Authority | 3/16/2021 at 10 AM CSTTo attend the Bid Opening by phone, dial 877-286-5733 and enter conference ID: 892 509 482#. |
Project includes construction of approximately 11,700 LF of 60-inch water line and 380 LF of 84-inch water line along Mills Rd and Greens Bayou from FM 1960 to approximately 1,400 feet east of SH 249 located in Harris County, Texas. | Drawings & Specs |
NHCRWA-Project 25A- Proposed 84″ Water Line along CenterPoint Energy Northbelt Corridor |
AECOM – North Harris County Regional Water Authority | 3/16/2021 at 2 PM CSTTo attend the Bid Opening by phone, dial (877) 286-5733 and enter conference ID: 892 509 482#. |
Scope of Work includes construction of approximately 8,950 LF of 84-inch water line along CenterPoint Energy Northbelt Corridor beginning approximately 1,100 feet west of Bammel North Houston Road and ending approximately 3,200 feet east of Antoine Drive in Harris County, Texas | Drawings & Specs |
NHCRWA-Project 28D-Proposed 60″ Waterline Along Mills Rd/ Greens Bayou from FM 1960 to NHCRWA Project 16 | AECOM – North Harris County Regional Water Authority | 2/16/2021 at 10 AM CST
To participate by video conference, go to https://tinyurl.com/NHCRWA-Prebid-28D. To participate by telephone conference only dial 877-286-5733 and enter conference ID: 745 067 788#. |
Project includes construction of approximately 11,740 LF of 84-inch water line along CenterPoint Energy Northbelt Corridor between the proposed SH 249 (SH249) regional pump station (Gessner Road and Beltway 8) to just east of Hollister Road in Harris County, Texas. | Drawings & Specs |