Contract amount: $24 million Calder Street Drainage Improvement: This job included street and drainage improvements on Calder Street from Pheland Boulevard to the IH-10 east bound frontage road. The work included removing landscaping, planters, asphalt overlay, concrete pavement and curb, flexible base, surfacing, driveways and sidewalks. Reytec also removed inlets, manholes, culverts and storm pipe as well as placed new storm sewer box, pipes, inlets and manholes. Our crew also installed new storm sewer, inlets, […]
UPTOWN DEVELOPMENT AUTHORITY – MIDDLE SECTION
This construction included the removal of existing asphalt paving and curb for approximately 1,000 linear feet and the placement of 10-inch thick, 5-lane concrete boulevard section with 9-inch crushed subgrade.
WILLIAM P. HOBBY AIRPORT – TERMINAL IMPROVEMENT PROGRAM – PHASE 1
Contract amount: $7.7 million William P. Hobby Airport – Terminal Improvement Program: East Concourse and Ticketing Building – Phase 1 This project consisted of demolishing the existing pavement and replacing 35,000 square yards of 16-inch concrete pavement at the Apron area. It also included constructing temporary access ways, installing trench drain, foundation for the blast wall and stripping the gates. For more details on this project, please contact Reytec Projects.
UT M.D. ANDERSON CANCER CENTER – Eby Bates
Contract amount: $2.2 million M.D. Anderson Cancer Center: Reytec acted as prime subcontractor to Eby Construction/Flintco. Reytec was responsible for the realignment of Bates Road in front of the Clark Cancer Clinic, which included the relocation of large diameter oak trees, dedicated monument pavers, the installation of temporary asphalt roads, sidewalks and temporary pedestrian walkways, and the relation of all underground utilities, water meter vaults, the construction of concrete planter walls, junction boxes and planter boxes. […]
CALDER STREET DRAINAGE IMPROVEMENT – Phase III
Contract amount: $9 million Calder Street Drainage Improvement – Phase III: This job included street and drainage improvements on Calder Street from Pheland Boulevard to the IH-10 east bound frontage road. Reytec removed inlets, manholes, culverts and storm pipe as well as placed new storm sewer box, pipes, inlets and manholes. Our crew also installed new storm sewer, inlets, construct base and concrete pavement with curb and gutter. We also removed landscaping, planters, asphalt overlay, […]
Chaparral Street – Williams St. to Schatzel St.
Contract Amount: $5 million Downtown Street Improvements to Chaparral Street from William Street to Schatzel Street: This project included the redesign of the roadway and pedestrian right of way of Chaparral Street between William Street and Schatzel Street. The right of way included designed pavers, planters and catenary lighting to enhance the overall atmosphere of the street. For more details on this project, please contact Reytec Projects.