|
![]() |
||
|
CITY OF HOUSTON
72” Watermain along Ella Blvd. and W. 12 th St. Reytec Construction acted as a Prime Subcontractor to Jalco, Inc. and was responsible for concrete paving, driveways, sidewalks, asphalt paving, road excavation, lime stabilization, installation of stabilized base, storm sewer, B-B inlets, and type C manholes.
Contract Amount: $1,654,420.00 Completion Date: 02/2004
|
|||