|
![]() |
||
|
CITY OF HOUSTON
48” Water Main Along Clinton, Lathrop, and Majestic Streets Reytec Construction acted as Prime Subcontractor to Jalco, Inc. and was responsible for concrete paving, driveways, sidewalks, asphalt paving, road excavation, lime stabilization, installation of stabilized base, 24” storm sewer, B-B inlets, and type C manholes. Construction Vale: $2,518,000.00
Completion Date: 02/21/01
|
|||