HARRIS COUNTY

 

C.E. King Parkway from Tidwell Road to Beaumont Highway

Reytec is the Prime Contractor to Harris County and is responsible for 35,000 square yards four lane 10” concrete roadway with an esplanade and concrete lined drainage channel, asphalt paving, two (2) concrete roadway bridge crossings, road excavation, lime stabilization, installation of stabilized base, B-B inlets, and type C manholes.

 

Storm Sewer:

2,005 lf - 24” RCP Storm Sewer
190 lf - 30” RCP Storm Sewer
67 lf - 42” RCP Storm Sewer
985 lf - 54” RCP Storm Sewer
698 lf - 4’x3’ Reinforced Concrete Box Culvert
494 lf - 5x3 Reinforced Concrete Box Culvert
79 lf - 5’x5’ Reinforced Concrete Box Culvert
515 lf - 5’x5’ Reinforced Concrete Box Culvert
400 lf - 6’x3’ Reinforced Concrete Box Culvert
67 lf - 6’x4’ Reinforced Concrete Box Culvert
75 lf - 10’x6’ Reinforced Concrete Box Culvert

 

Contract Amount: $5,616,000.00

% Completed: 95%
Projected Completion: 3/2006